Crane Machinery/Crushing Lifting

Liebherr Tower Cranes at Work on Restauration of Parador de Santiago
Two Liebherr EC-B tower cranes support the heritage-sensitive restoration

The Rise Factor
As buildings soar higher, the challenge of moving materials efficiently becomes mission-critical. The rise factor isn’t just about height—it’s about smart logistics, precision equipment, and seamless vertical transportation.

Govt Defers OTR-2024 Implementation to September 2026
The OTR-2024 was to come into effect from August 28, 2025

First New Liebherr 43 K Fast-Erecting Crane Goes to Zimmerei Frank in Munich
Liebherr fast-erecting cranes deliver high hook height, compact design

Lifting India’s Future
As India builds faster and taller, industrial cranes are emerging as essential, intelligent machines powering the nation’s infrastructure, logistics, and industrial growth.

Lifting India’s Future
As India builds faster and taller, industrial cranes are emerging as essential, intelligent machines powering the nation’s infrastructure, logistics, and industrial growth.

Off-Road Revolution
OTR tyres are driving a new era in heavy-duty mobility, transforming performance, safety, and durability across mining, construction, and infrastructure’s toughest terrains

The crane market is expected to see consistent growth
Arvind Rishi, AVP – Sales & After Market, TIL Limited, speaks about the evolving demand for industrial cranes driven by the rise in industrial projects in India, and how safety features are increasingly being incorporated into these cranes.

Mega Machines!
From metro tunnellers to 3D-printed bridges, the future of Indian infrastructure may depend on super-sized mega machines — but will terrain, cost, and scale cooperate?

WOLFF’s Intuitive Wireless Crane Control System
At bauma 2025, Wolffkran presented a world’s first in wireless crane control: WOLFF Intuitive Control. This groundbreaking technology fundamentally redefines crane operation via remote control – introducing an intuitive control system that, for the first time, shifts the focus from crane movement to load movement.